Submitting the present status about MEP and related works as per scope of services, BRACU new campus project
This record consists of general correspondence regarding Submitting the present status about MEP and related works as per scope of services of BRAC University new campus project.
Egile nagusia: | Brac University |
---|---|
Formatua: | General correspondence |
Hizkuntza: | English |
Argitaratua: |
Brac University
2023
|
Gaiak: | |
Sarrera elektronikoa: | http://hdl.handle.net/10361/19544 |
Antzeko izenburuak
-
The status of MEP IFC drawing
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Instruction to appoint experienced architect and MEP engineer to supervise the finishing works and MEP works of BRAC University new campus project
nork: BUCG-ABC Joint Venture (BUCG-ABC JV)
Argitaratua: (2023) -
Instruction to appoint experienced architect and MEP engineer to supervise the finishing works and MEP works
nork: Brac University
Argitaratua: (2023) -
Reminder for submitting the coordinated drawing on M & E design of BRACU new campus
nork: Brac University
Argitaratua: (2023) -
Observation on MEP design submission by BUCG
nork: Brac University
Argitaratua: (2023)