Regarding inspection before shipment of pre-engineering steel works and components
This record consists of general correspondence regarding the inspection before shipment of pre-engineering steel works and components of BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19533 |
مواد مشابهة
-
Regarding inspection of pre-engineering steel sections
بواسطة: Brac University
منشور في: (2023) -
Submission of detail quantity of pre-engineering steel section
بواسطة: Brac University
منشور في: (2023) -
Instruction to submit supply schedule for pre-engineering steel section
بواسطة: Brac University
منشور في: (2023) -
Shipment of pre-fabricated steel building (Shipment of steel structure against LC no. 0000021619010057 dated: 26.02.19)
بواسطة: Brac University
منشور في: (2023) -
Adjustment of LC amount with billed amount against supplied pre-fabricated steel structure
بواسطة: Brac University
منشور في: (2023)