Reply to letter having reference number BUCG-ABC JV/BRACU/07/18 dated 17th March, 2018
This record consists of general correspondence regarding reply to letter having reference number BUCG-ABC JV/BRACU/07/18 dated 17th March, 2018 of BRAC University new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/19529 |
Benzer Materyaller
-
Reply to letter having reference number BUCG-ABC JV/BRACU/24/18 dated 28th April 2018
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Reply to instruction to submit cash flow estimate of BRAC University new campus project
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
BUCG-ABC JV cashflow calculation
Yazar:: BUCG-ABC Joint Venture (BUCG-ABC JV)
Baskı/Yayın Bilgisi: (2023) -
The engineer's instruction to submit organogram of BUCG-ABC JV
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
The engineer's instruction to submit organogram at BUCG-ABC JV
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023)