Reply to letter having reference number BUCG-ABC JV/BRACU/07/18 dated 17th March, 2018
This record consists of general correspondence regarding reply to letter having reference number BUCG-ABC JV/BRACU/07/18 dated 17th March, 2018 of BRAC University new campus project.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19529 |
Eitemau Tebyg
-
Reply to letter having reference number BUCG-ABC JV/BRACU/24/18 dated 28th April 2018
gan: Brac University
Cyhoeddwyd: (2023) -
Reply to instruction to submit cash flow estimate of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
BUCG-ABC JV cashflow calculation
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
The engineer's instruction to submit organogram of BUCG-ABC JV
gan: Brac University
Cyhoeddwyd: (2023) -
The engineer's instruction to submit organogram at BUCG-ABC JV
gan: Brac University
Cyhoeddwyd: (2023)