Reply to the letters of Century group on pre-cast piling for construction of BRAC University
This record consists of general correspondence regarding reply to the letters of Century group on pre-cast piling for construction of BRAC University new campus project.
Glavni autor: | Brac University |
---|---|
Format: | General correspondence |
Jezik: | English |
Izdano: |
Brac University
2023
|
Teme: | |
Online pristup: | http://hdl.handle.net/10361/19524 |
Similar Items
-
Observation during pre-cast pile
od: Brac University
Izdano: (2023) -
Driving pre-cast piles for construction of BRAC University new campus project
od: Century Realty Limited
Izdano: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Izdano: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
od: Brac University
Izdano: (2023) -
Construction of shore pile in zone C
od: Brac University