Reply to the letters of Century group on pre-cast piling for construction of BRAC University
This record consists of general correspondence regarding reply to the letters of Century group on pre-cast piling for construction of BRAC University new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19524 |
Documents similaires
-
Observation during pre-cast pile
par: Brac University
Publié: (2023) -
Driving pre-cast piles for construction of BRAC University new campus project
par: Century Realty Limited
Publié: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
par: Brac University
Publié: (2023) -
Construction of shore pile in zone C
par: Brac University
Publié: (2023)