Reply to the letters of Century group on pre-cast piling for construction of BRAC University
This record consists of general correspondence regarding reply to the letters of Century group on pre-cast piling for construction of BRAC University new campus project.
Autor principal: | Brac University |
---|---|
Formato: | General correspondence |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19524 |
Ejemplares similares
-
Observation during pre-cast pile
por: Brac University
Publicado: (2023) -
Driving pre-cast piles for construction of BRAC University new campus project
por: Century Realty Limited
Publicado: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
por: Brac University
Publicado: (2023) -
Construction of shore pile in zone C
por: Brac University
Publicado: (2023)