Observation during pre-cast pile
This record consists of general correspondence regarding observation during pre-cast pile driving of BRAC University new campus project.
Huvudupphovsman: | Brac University |
---|---|
Materialtyp: | General correspondence |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/19520 |
Liknande verk
-
Driving pre-cast piles for construction of BRAC University new campus project
av: Century Realty Limited
Publicerad: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
av: BUCG-ABC Joint Venture
Publicerad: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
av: Brac University
Publicerad: (2023) -
Suggestion about structure pile test
av: Brac University
Publicerad: (2023)