Observation during pre-cast pile
This record consists of general correspondence regarding observation during pre-cast pile driving of BRAC University new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19520 |
Podobne zapisy
-
Driving pre-cast piles for construction of BRAC University new campus project
od: Century Realty Limited
Wydane: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
od: BUCG-ABC Joint Venture
Wydane: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
od: Brac University
Wydane: (2023) -
Suggestion about structure pile test
od: Brac University
Wydane: (2023)