Observation during pre-cast pile
This record consists of general correspondence regarding observation during pre-cast pile driving of BRAC University new campus project.
Autor Principal: | Brac University |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado: |
Brac University
2023
|
Subjects: | |
Acceso en liña: | http://hdl.handle.net/10361/19520 |
Títulos similares
-
Driving pre-cast piles for construction of BRAC University new campus project
por: Century Realty Limited
Publicado: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
por: Brac University
Publicado: (2023) -
Suggestion about structure pile test
por: Brac University
Publicado: (2023)