Observation during pre-cast pile
This record consists of general correspondence regarding observation during pre-cast pile driving of BRAC University new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/19520 |
Documents similaires
-
Driving pre-cast piles for construction of BRAC University new campus project
par: Century Realty Limited
Publié: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
par: BUCG-ABC Joint Venture
Publié: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
par: Brac University
Publié: (2023) -
Suggestion about structure pile test
par: Brac University
Publié: (2023)