Observation during pre-cast pile
This record consists of general correspondence regarding observation during pre-cast pile driving of BRAC University new campus project.
Hovedforfatter: | Brac University |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/19520 |
Lignende værker
-
Driving pre-cast piles for construction of BRAC University new campus project
af: Century Realty Limited
Udgivet: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
af: BUCG-ABC Joint Venture
Udgivet: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
af: Brac University
Udgivet: (2023) -
Suggestion about structure pile test
af: Brac University
Udgivet: (2023)