Observation during pre-cast pile
This record consists of general correspondence regarding observation during pre-cast pile driving of BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19520 |
مواد مشابهة
-
Driving pre-cast piles for construction of BRAC University new campus project
بواسطة: Century Realty Limited
منشور في: (2023) -
Pre-qualification documents for pre-cast pile subcontractor
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Permission for dismantling north-east side boundary wall of century center to drive pre-cast piles
بواسطة: Brac University
منشور في: (2023) -
Suggestion about structure pile test
بواسطة: Brac University
منشور في: (2023)