Connectivity of generation for BRAC University new campus project
This record consists of general correspondence regarding connectivity of generation for BRAC University new campus project.
1. autor: | Brac University |
---|---|
Format: | General correspondence |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/19466 |
Podobne zapisy
-
Instruction to start the work at BRACU new campus project (Generator)
od: Brac University
Wydane: (2023) -
Instruction to start the work of generator at BRACU new campus project
od: Brac University
Wydane: (2023) -
Update regarding power connection for temporary 1000 KW load
od: Brac University
Wydane: (2023) -
Valuation of rebar connection via mechanical coupler
od: Brac University
Wydane: (2023) -
Valuation of rebar connection via mechanical coupler
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023)