Reply to letter having reference number BUCG-ABC JV/BRACU/24/18 dated 28th April 2018
This record consists of general correspondence regarding reply to letter having reference number BUCG-ABC JV/BRACU/24/18 dated 28th April 2018 addressing the issue of substantiation of claims due to the defective diaphragm wall of BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19464 |
مواد مشابهة
-
Reply to letter having reference number BUCG-ABC JV/BRACU/07/18 dated 17th March, 2018
بواسطة: Brac University
منشور في: (2023) -
Substantiation of claims of diaphragm wall of BRAC University new campus project
بواسطة: Brac University
منشور في: (2023) -
Request for response time regarding substantiation claim on the diaphragm wall
بواسطة: Brac University
منشور في: (2023) -
Reply to instruction to submit cash flow estimate of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
BUCG-ABC JV cashflow calculation
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023)