Evaluation for additional work of shoring pile work between zone A and C
This record consists of general correspondence regarding evaluation for additional work of shoring pile work between zone A and C of BRAC University new campus project.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/19458 |
Samankaltaisia teoksia
-
Evaluation for additional work of shoring pile work between zone B
Tekijä: Brac University
Julkaistu: (2023) -
Notice for additional work of shoring pile work
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023) -
Evaluation for additional work of shoring pile work in zone B
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
VO #033 Proposal of 800mm Dia shoring piles works at zone C of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023)