Pilecap And Raft - Basement 3 ( Zone A & zone C)
This record contains structural contractor shop drawings in perspective of their Request for Approval (RFA) for Brac University new campus project. It contains PDF version of structural contractor shop drawings.
| Principais autores: | WOHA Designs PTE LTD, Web Structures, BUCG |
|---|---|
| Formato: | Drawing |
| Idioma: | English |
| Publicado em: |
Brac University
2023
|
| Assuntos: | |
| Acesso em linha: | http://hdl.handle.net/10361/19447 |
Registros relacionados
-
Pilecap And Raft - Basement - 3 (Zone B)
por: WOHA Designs PTE LTD, et al.
Publicado em: (2023) -
Pile caps and raft of BRAC University new campus project
por: WEB Structures
Publicado em: (2023) -
Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Notice: Commencing the retaining pile and jet grouting pile in Zone C
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Evaluation for additional work of shoring pile work in zone B
por: BUCG-ABC Joint Venture
Publicado em: (2023)