Evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project
This record consists of general correspondence regarding evaluation for additional work of waterproofing on the retaining wall and capping beam of BRAC University new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/19446 |
مواد مشابهة
-
VO.02 - Final valuation of waterproofing on the retaining wall and capping beam
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Notice for additional work of waterproofing work for retain wall and capping beam
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Evaluation for additional work of waterproofing on the retaining wall and capping beam
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Waterproofing for retaining wall
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023)