Rate analysis for guide wall dismantling work of BRAC University new campus project
This record consists of general correspondence regarding rate analysis for guide wall dismantling work of BRAC University new campus project.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19441 |
Eitemau Tebyg
-
Approval of non-tender work of dismantling of guide wall
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Seeking permission to dismantle north-east side boundary wall of century center to drive pre-cast piles
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
Volume of guide wall breaking for BRACU new campus development project
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
Instruction to start the work of brick Wall & boundary at BRACU new campus project
gan: Brac University
Cyhoeddwyd: (2023) -
Instruction to start the work at BRACU new campus project (Brick wall & boundary)
gan: Brac University
Cyhoeddwyd: (2023)