Building management system
This record contains drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
Tác giả chính: | Electro-Mechanical Control Services (EMCS) |
---|---|
Định dạng: | Drawing |
Ngôn ngữ: | English |
Được phát hành: |
Brac University
2023
|
Những chủ đề: | |
Truy cập trực tuyến: | http://hdl.handle.net/10361/19378 |
Những quyển sách tương tự
Những quyển sách tương tự
-
Design process of MDB & BMS system
Bằng: BUCG-ABC Joint Venture (BUCG-ABC JV)
Được phát hành: (2023) -
Initial observation on the BMS system design drawings and BOQ
Bằng: Brac University
Được phát hành: (2023) -
The development and designing of stent for treatment of Atherosclerosis
Bằng: Munni, Monika Nasrin
Được phát hành: (2021) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of July 4, 2020
Bằng: BUCG
Được phát hành: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
Bằng: BUCG
Được phát hành: (2023)