Building management system
This record contains drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
Hoofdauteur: | Electro-Mechanical Control Services (EMCS) |
---|---|
Formaat: | Drawing |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19378 |
Gelijkaardige items
-
Design process of MDB & BMS system
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Initial observation on the BMS system design drawings and BOQ
door: Brac University
Gepubliceerd in: (2023) -
The development and designing of stent for treatment of Atherosclerosis
door: Munni, Monika Nasrin
Gepubliceerd in: (2021) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of July 4, 2020
door: BUCG
Gepubliceerd in: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
door: BUCG
Gepubliceerd in: (2023)