Building management system
This record contains drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
Prif Awdur: | Electro-Mechanical Control Services (EMCS) |
---|---|
Fformat: | Drawing |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19378 |
Eitemau Tebyg
-
Design process of MDB & BMS system
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Initial observation on the BMS system design drawings and BOQ
gan: Brac University
Cyhoeddwyd: (2023) -
The development and designing of stent for treatment of Atherosclerosis
gan: Munni, Monika Nasrin
Cyhoeddwyd: (2021) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of July 4, 2020
gan: BUCG
Cyhoeddwyd: (2023) -
M&E design deliverable under the contract BRACU-DS-BUCG-2019-001 as of Dec 12, 2020
gan: BUCG
Cyhoeddwyd: (2023)