Roof irrigation system drawing for playground & swimming pool
This record contains drawings of Brac University New Campus Project. It consists of PDF version of drawings.
Hoofdauteur: | Electro-Mechanical Control Services (EMCS) |
---|---|
Formaat: | Drawing |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/19316 |
Gelijkaardige items
-
Base Drawing for pump of roof irrigation system
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023) -
Comment from WOHA on conceptual drawing of swimming pool of BRAC University new campus project
door: Brac University
Gepubliceerd in: (2023) -
Roof irrigation & drainage system as-built drawing of BRAC University New Campus Project for RAJUK
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2024) -
HVAC drawings
door: Electro-Mechanical Control Services (EMCS)
Gepubliceerd in: (2023) -
Re: Outstanding design conditions as of 27 April, 2020
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)