Deep tube Well & WASA piping layout drawing
This record contains drawings of Brac University New Campus Project. It consists of PDF version of drawings.
Autore principale: | Electro-Mechanical Control Services (EMCS) |
---|---|
Natura: | Drawing |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/19314 |
Documenti analoghi
-
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Planning and project appraisal: a brief on the Deep Tube Well (DTW) irrigation programme of BRAC
di: Mustafa, Shams, et al.
Pubblicazione: (2019) -
Installation of 2nd deep tube-well works
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Tube well coordinate confirmation, notice of tube well construction
di: BUCG-ABC Joint Venture
Pubblicazione: (2023) -
Installation of 2nd deep tube-well at BRACU new campus project
di: Brac University
Pubblicazione: (2023)