Deep tube Well & WASA piping layout drawing
This record contains drawings of Brac University New Campus Project. It consists of PDF version of drawings.
Autor principal: | Electro-Mechanical Control Services (EMCS) |
---|---|
Formato: | Drawing |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/19314 |
Ejemplares similares
-
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Planning and project appraisal: a brief on the Deep Tube Well (DTW) irrigation programme of BRAC
por: Mustafa, Shams, et al.
Publicado: (2019) -
Installation of 2nd deep tube-well works
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Tube well coordinate confirmation, notice of tube well construction
por: BUCG-ABC Joint Venture
Publicado: (2023) -
Installation of 2nd deep tube-well at BRACU new campus project
por: Brac University
Publicado: (2023)