Deep tube Well & WASA piping layout drawing
This record contains drawings of Brac University New Campus Project. It consists of PDF version of drawings.
Κύριος συγγραφέας: | Electro-Mechanical Control Services (EMCS) |
---|---|
Μορφή: | Drawing |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/19314 |
Παρόμοια τεκμήρια
-
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Planning and project appraisal: a brief on the Deep Tube Well (DTW) irrigation programme of BRAC
ανά: Mustafa, Shams, κ.ά.
Έκδοση: (2019) -
Installation of 2nd deep tube-well works
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Tube well coordinate confirmation, notice of tube well construction
ανά: BUCG-ABC Joint Venture
Έκδοση: (2023) -
Installation of 2nd deep tube-well at BRACU new campus project
ανά: Brac University
Έκδοση: (2023)