Deep tube Well & WASA piping layout drawing
This record contains drawings of Brac University New Campus Project. It consists of PDF version of drawings.
Autor principal: | Electro-Mechanical Control Services (EMCS) |
---|---|
Format: | Drawing |
Idioma: | English |
Publicat: |
Brac University
2023
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/19314 |
Ítems similars
-
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Planning and project appraisal: a brief on the Deep Tube Well (DTW) irrigation programme of BRAC
per: Mustafa, Shams, et al.
Publicat: (2019) -
Installation of 2nd deep tube-well works
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Tube well coordinate confirmation, notice of tube well construction
per: BUCG-ABC Joint Venture
Publicat: (2023) -
Installation of 2nd deep tube-well at BRACU new campus project
per: Brac University
Publicat: (2023)