Co-ordination riser drawings
This record contains mechanical drawings of Brac University New Campus Project. It consists of dwg drawings.
Prif Awdur: | Electro-Mechanical Control Services (EMCS) |
---|---|
Fformat: | Drawing |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19255 |
Eitemau Tebyg
-
Co-ordination drawing
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023) -
Treated water supply riser diagram
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023) -
Treated waste water supply riser diagram
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023) -
Single line diagram of south riser (conventional system)
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023) -
Single line diagram of south riser (siphonic system)
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023)