Co-ordination drawing
This record contains mechanical drawings of Brac University new campus project. It consists of DWG version of drawings.
Príomhchruthaitheoir: | Electro-Mechanical Control Services (EMCS) |
---|---|
Formáid: | Drawings |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19239 |
Míreanna comhchosúla
-
Co-ordination riser drawings
de réir: Electro-Mechanical Control Services (EMCS)
Foilsithe / Cruthaithe: (2023) -
Fire management system drawing ( Addressable fire alarm system drawings)
de réir: Electro-Mechanical Control Services (EMCS)
Foilsithe / Cruthaithe: (2023) -
Fire management system (fire protection layout drawing)
de réir: JA Architects Ltd., et al.
Foilsithe / Cruthaithe: (2023) -
Deep tube Well & WASA piping layout drawing
de réir: Electro-Mechanical Control Services (EMCS)
Foilsithe / Cruthaithe: (2023) -
International workshop on the draft right to information ordinance 2008
de réir: Ahmed, Haydory Akbar, et al.
Foilsithe / Cruthaithe: (2014)