Co-ordination drawing
This record contains mechanical drawings of Brac University new campus project. It consists of DWG version of drawings.
Prif Awdur: | Electro-Mechanical Control Services (EMCS) |
---|---|
Fformat: | Drawings |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/19239 |
Eitemau Tebyg
-
Co-ordination riser drawings
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023) -
Fire management system drawing ( Addressable fire alarm system drawings)
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023) -
Fire management system (fire protection layout drawing)
gan: JA Architects Ltd., et al.
Cyhoeddwyd: (2023) -
Deep tube Well & WASA piping layout drawing
gan: Electro-Mechanical Control Services (EMCS)
Cyhoeddwyd: (2023) -
International workshop on the draft right to information ordinance 2008
gan: Ahmed, Haydory Akbar, et al.
Cyhoeddwyd: (2014)