Electrical BBT system drawing
This record contains drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
Asıl Yazarlar: | WOHA Designs PTE LTD, Brac University Electrical Engineering Team |
---|---|
Materyal Türü: | Drawings |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/18934 |
Benzer Materyaller
Access control system drawing
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023)
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023)
Benzer Materyaller
-
Electrical BBT system drawing
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023) -
Instruction to start the work at BRACU new campus project (BBT system)
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Electrical system for generator
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023) -
Security system drawing
Yazar:: WOHA Designs PTE LTD, ve diğerleri
Baskı/Yayın Bilgisi: (2023)