Electrical BBT system drawing
This record contains drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
Príomhchruthaitheoirí: | WOHA Designs PTE LTD, Brac University Electrical Engineering Team |
---|---|
Formáid: | Drawings |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/18934 |
Míreanna comhchosúla
-
Electrical BBT system drawing
de réir: WOHA Designs PTE LTD, et al.
Foilsithe / Cruthaithe: (2023) -
Instruction to start the work at BRACU new campus project (BBT system)
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Regarding bill payment for supply installation, testing and commissioning of 415V, 50Hz, TPN+PE sandwich copper type tested Busbar Trunking System at BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Electrical system for generator
de réir: WOHA Designs PTE LTD, et al.
Foilsithe / Cruthaithe: (2023) -
Security system drawing
de réir: WOHA Designs PTE LTD, et al.
Foilsithe / Cruthaithe: (2023)