Grievance handling procedure of SS Power I Limited
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2023.
Príomhchruthaitheoir: | Tamim, Ishmam Ahmed |
---|---|
Rannpháirtithe: | Hossain, Syed Far Abid |
Formáid: | Internship report |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/18722 |
Míreanna comhchosúla
-
Roof irrigation system drawing for playground & swimming pool
de réir: Electro-Mechanical Control Services (EMCS)
Foilsithe / Cruthaithe: (2023) -
Supplier management process of ACI Limited, Bangladesh
de réir: Md. Zaki, Erfan
Foilsithe / Cruthaithe: (2016) -
Grievance handling procedure of Scandex Knitwear Ltd.
de réir: Bhuiyan, Md. Rokeybul Abedin
Foilsithe / Cruthaithe: (2015) -
Internship at Impress Telefilm Limited Channel i
de réir: Hasan, Nikita Azmi
Foilsithe / Cruthaithe: (2020) -
Recruitment and selection process of Stencil Bangladesh Limited
de réir: Hoque, Nazifa
Foilsithe / Cruthaithe: (2016)