People's perception in Early Warning System: a case study of Bhandara VDC Padariya-7 in Chitwan district, Nepal
This dissertation is submitted in partial fulfillment of the requirements for the degree of Master in Disaster Management, 2011.
Autor principal: | Lamichhane, Richa |
---|---|
Outros Autores: | Rahman, Md. Rezaur |
Formato: | Dissertation |
Idioma: | English |
Publicado em: |
BRAC University
2012
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/1821 |
Registos relacionados
-
Flood warning system: a cost- benefit analysis of the northern Bangladesh
Por: Hasan, Mohammad Kamrul
Publicado em: (2018) -
Cyclone warning in Bangladesh and preparedness effort
Por: Ferdous, Maliha
Publicado em: (2018) -
The potential role of mobile network in disseminating flood warning: a study on a pilot project in two upazilas under Manikganj and Tangail
Por: Kamran, M.
Publicado em: (2011) -
Assessing the cyclone early warning services of women, children and person with disability: a case study in Nijhumdwip
Por: Shahjahan, Md.
Publicado em: (2018) -
Flood monitoring and warning system for embankment using IoT
Por: Dutta, Aparup, et al.
Publicado em: (2022)