Project Financing of Summit Bibiyana Power Company Limited
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2022.
Κύριος συγγραφέας: | |
---|---|
Άλλοι συγγραφείς: | |
Μορφή: | Internship report |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/17770 |
id |
10361-17770 |
---|---|
record_format |
dspace |
spelling |
10361-177702023-01-24T04:31:38Z Project Financing of Summit Bibiyana Power Company Limited Zahan, Ramisha Akther Choudhury, Ahmed Abir Brac Business School, Brac University Project finance SBPCL Agreement Risk management Financial performance Capital investments. Corporations--Finance--Planning. This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2022. Cataloged from PDF version of internship report. Includes bibliographical references (pages 69-70). The process of using a non-recourse or limited recourse financial framework to fund or finance any long-term infrastructure, industrial projects, or public services is referred to as "project financing." Summit Group is Bangladesh's largest infrastructure company, with several business segments spanning electricity, shipping, and communications. Its power sector, which include both Turbine and Reciprocating Engine Divisions, have a total installed capacity of 1,941 MW. Project Bibiyana is a 341MW combined-cycle gas-fired power generation facility in Bangladesh's Habiganj district. Summit Bibiyana Power Company (SBPCL), a special purpose corporation established in 2010 under Bangladeshi regulations, conducted this project. Summit Power Limited, the parent business of SBPCL, is in charge of the firm. One GE 9 FA Gas Turbine Generator, one Heat Recovery Steam Generator, and one Steam Turbine Generator are used to set up this project. The main goal of this project is to construct and operate power plants for energy generation and distribution. IFC, World Bank Group, ADB, and Bangladesh's Department of Environment (DOE) have all accepted environmental and social principles for Project Bibiyana Power Plant. I have addressed the information I've received from working in a corporate atmosphere in the first section of the report and provided the idea of project financing of Summit Bibiyana Power Company Limited (SBPCL) as a whole along with the analysis of their past five years financial performance after project completion in subsequent sections of the report. This study provides information related to project finance, steps and different elements of the project finance, contracts and agreements, policies, project costs and assumptions present in the financial model of SBPCL, past five years financial performance, risks and challenges associated with project finance. A small survey is conducted on around 50 people outside the organization and all of the survey results are appropriately examined in the report. Finally, the entire study has been summarized and concluded. Therefore, this report is a study and findings on project finance which would provide individuals from different industries with information related to project finance and get better understanding of the elements associated with it. Ramisha Akther Zahan B. Business Administration 2023-01-19T07:35:48Z 2023-01-19T07:35:48Z 2022 2022-06-16 Internship report ID: 17104107 http://hdl.handle.net/10361/17770 en BRAC University Internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 73 Pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
Project finance SBPCL Agreement Risk management Financial performance Capital investments. Corporations--Finance--Planning. |
spellingShingle |
Project finance SBPCL Agreement Risk management Financial performance Capital investments. Corporations--Finance--Planning. Zahan, Ramisha Akther Project Financing of Summit Bibiyana Power Company Limited |
description |
This internship report is submitted in partial fulfillment of the requirements for the degree of Bachelor of Business Administration, 2022. |
author2 |
Choudhury, Ahmed Abir |
author_facet |
Choudhury, Ahmed Abir Zahan, Ramisha Akther |
format |
Internship report |
author |
Zahan, Ramisha Akther |
author_sort |
Zahan, Ramisha Akther |
title |
Project Financing of Summit Bibiyana Power Company Limited |
title_short |
Project Financing of Summit Bibiyana Power Company Limited |
title_full |
Project Financing of Summit Bibiyana Power Company Limited |
title_fullStr |
Project Financing of Summit Bibiyana Power Company Limited |
title_full_unstemmed |
Project Financing of Summit Bibiyana Power Company Limited |
title_sort |
project financing of summit bibiyana power company limited |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/17770 |
work_keys_str_mv |
AT zahanramishaakther projectfinancingofsummitbibiyanapowercompanylimited |
_version_ |
1814308149302132736 |