Reducing Cost in RMG sector & IE as its importance Of Lithe Group

This internship report is submitted in partial fulfillment of the requirements for the degree of Post Graduate Diploma in Knitwear Industry Management, 2021.

Detaylı Bibliyografya
Yazar: Hossain, Md. Al Mamun
Diğer Yazarlar: Rahman, Khandaker Wahedur
Materyal Türü: Internship report
Dil:en_US
Baskı/Yayın Bilgisi: Brac University 2022
Konular:
Online Erişim:http://hdl.handle.net/10361/16875
id 10361-16875
record_format dspace
spelling 10361-168752023-01-24T09:39:11Z Reducing Cost in RMG sector & IE as its importance Of Lithe Group Hossain, Md. Al Mamun Rahman, Khandaker Wahedur Iqbal, Md. Javed Brac Institute of Governance and Development, Brac University Reducing Cost RMG sector IE Industrial Engineering This internship report is submitted in partial fulfillment of the requirements for the degree of Post Graduate Diploma in Knitwear Industry Management, 2021. Cataloged from PDF version of internship report. Includes bibliographical references (page 17). This report provides that how to reduce cost in garments industry based on Industrial Engineering, like how IE department will reduce cost, what is the procedure of reducing cost, Capability of this factory and other departments in garments and their capacity. Methods of analysis of this report including practical research and data analysis with the help of department head in this organization, such as knitting capacity, Dyeing, and AOP capacity, cutting, sewing, finishing capacity, and their working procedures, and how to reduce the cost of that department with the help of IE. Results of the data analysis showed that this organization's knitting capacity is 40,000 Kgs where their used machine is Mayer & Cie and Matsuya and this knitting produced Single Jersey, Rib, Pique, Fleece, Terry, Mesh, Double Jersey, Interlock, Waffle/Thermal, etc. The dyeing section used machine is Sclavos, Thies, and Fongs and its capacity is 50 tones solid and 30 tones Yarn dyeing and 20 tones AOP production per day. This organization has also a print and embroidery section where the printing capacity is 70000 pcs, and embroidery capacity is 8,000 to 10,000 pieces. This organization CAD used updated GEMINI software and produced marker for 10 cutting table where Cutting capacity is 170000 where there have 3 updated auto spreader and 1 auto-cutter from FK France and FK Italy. and sewing capacity is 150000 pcs, and these 2 departments completely control IE department, where the manufacturing technology is being gradually transforming to adopting LEAN production after came IE for this department sewing efficiency increased by 8%, and cutting production increased minimum 10000 pcs. Also, an IE of cutting reduces sticker and ink by 30% of its total usage. This organization has worthy buyers such as M&S, Next, HRM, LPP, Zeeman, and Takko. The report has shown that how to decrease product cost and waste reduction of each department. The major area of viii weakness is the textile and dyeing section of this organization, they have capacity but they did not achieve the target as per capacity. Dyeing planning should be adjusted as per colorwise and fabrication wise so that process loss might be reduced ➢ Management should proper monitoring in dyeing and textile section. ➢ Need to sustain LEAN manufacturing system as per IE. The production was sometimes hampered due to accessories inhouse problem for merchandiser. The management of this organization are completely focused in sewing production but need to focused all the department of this organization as like sewing. sometimes department head was less focused on his job responsibility so that some internal problem was arisen. Md. Al Mamun Hossain P.G.D Knitwear Industry Management 2022-06-05T05:26:56Z 2022-06-05T05:26:56Z 2021 2021-05 Internship report ID: 19281139 http://hdl.handle.net/10361/16875 en_US Brac University internship reports are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 17 Pages application/pdf Brac University
institution Brac University
collection Institutional Repository
language en_US
topic Reducing Cost
RMG sector
IE
Industrial Engineering
spellingShingle Reducing Cost
RMG sector
IE
Industrial Engineering
Hossain, Md. Al Mamun
Reducing Cost in RMG sector & IE as its importance Of Lithe Group
description This internship report is submitted in partial fulfillment of the requirements for the degree of Post Graduate Diploma in Knitwear Industry Management, 2021.
author2 Rahman, Khandaker Wahedur
author_facet Rahman, Khandaker Wahedur
Hossain, Md. Al Mamun
format Internship report
author Hossain, Md. Al Mamun
author_sort Hossain, Md. Al Mamun
title Reducing Cost in RMG sector & IE as its importance Of Lithe Group
title_short Reducing Cost in RMG sector & IE as its importance Of Lithe Group
title_full Reducing Cost in RMG sector & IE as its importance Of Lithe Group
title_fullStr Reducing Cost in RMG sector & IE as its importance Of Lithe Group
title_full_unstemmed Reducing Cost in RMG sector & IE as its importance Of Lithe Group
title_sort reducing cost in rmg sector & ie as its importance of lithe group
publisher Brac University
publishDate 2022
url http://hdl.handle.net/10361/16875
work_keys_str_mv AT hossainmdalmamun reducingcostinrmgsectorieasitsimportanceoflithegroup
_version_ 1814309293123436544