Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle.
This dissertation is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2021.
Auteur principal: | |
---|---|
Autres auteurs: | |
Format: | Dissertation |
Langue: | English |
Publié: |
Brac University
2022
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/15894 |
id |
10361-15894 |
---|---|
record_format |
dspace |
spelling |
10361-158942022-01-13T21:01:34Z Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. Abduhu, Ananya Islam, Shah Eyamin- Ul Brac Institute of Governance and Development, Brac University Early Supplier Involvement (ESI) Elevator Sourcing strategies Integrated system Framework Agreement (FA) This dissertation is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2021. Cataloged from PDF version of dissertation. Includes bibliographical references (page 27). The world is modernizing day by day. With the pace of this modernization, every industry is trying to adopt digital process or appliances. So as in construction industry also. The accuracy and safety are given the most priority in construction industry. Now this has become easier to detect clash or problems by using software. For a high-rise building construction, elevator is one of the important product for doing the life easy. There is a connection between building design and construction and elevator. Standard size elevators ensure qualitative service as those are determined after several testing. In Bangladesh context, there arise conflicts regarding space and other criteria of elevator as most of the clients approach to the elevator suppliers at the finishing stages of building construction. This research highlights the advantages of supplier involvement in design phase and proposes a way of integration of end consumer to supplier. Ananya Abduhu M. Procurement and Supply Management 2022-01-13T04:44:25Z 2022-01-13T04:44:25Z 2021 2021-08 Dissertation ID 19382008 http://hdl.handle.net/10361/15894 en Brac University dissertations are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 27 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
Early Supplier Involvement (ESI) Elevator Sourcing strategies Integrated system Framework Agreement (FA) |
spellingShingle |
Early Supplier Involvement (ESI) Elevator Sourcing strategies Integrated system Framework Agreement (FA) Abduhu, Ananya Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. |
description |
This dissertation is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2021. |
author2 |
Islam, Shah Eyamin- Ul |
author_facet |
Islam, Shah Eyamin- Ul Abduhu, Ananya |
format |
Dissertation |
author |
Abduhu, Ananya |
author_sort |
Abduhu, Ananya |
title |
Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. |
title_short |
Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. |
title_full |
Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. |
title_fullStr |
Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. |
title_full_unstemmed |
Early Involvement of Supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. |
title_sort |
early involvement of supplier in construction design phase and managing the framework agreement and financial criteria throughout the project cycle. |
publisher |
Brac University |
publishDate |
2022 |
url |
http://hdl.handle.net/10361/15894 |
work_keys_str_mv |
AT abduhuananya earlyinvolvementofsupplierinconstructiondesignphaseandmanagingtheframeworkagreementandfinancialcriteriathroughouttheprojectcycle |
_version_ |
1814309571581181952 |