Risk assessment at public sector construction projects in Bangladesh: a case study
This dissertation is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2017.
Prif Awdur: | |
---|---|
Awduron Eraill: | |
Fformat: | Dissertation |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2021
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/15521 |
id |
10361-15521 |
---|---|
record_format |
dspace |
spelling |
10361-155212021-10-24T21:01:24Z Risk assessment at public sector construction projects in Bangladesh: a case study Mridha, Mohammad Zabed Alam Hoque, Md. Mosta Gausul Brac Institute of Governance and Development, Brac University Risk assessment Public construction Public works Building materials industry This dissertation is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2017. Cataloged from PDF version of dissertation. Includes bibliographical references (pages 56-57). The identification of risk, assessing risk and its proper management is a matter of great concern in risk management of a construction project. Unavailability of risk management or improper management of risk in a project may experience a enormous amount of loss in terms of monetary value. Considering these factors attention to pay to the necessity of risk management, the study has been carried out in the construction projects in Bangladesh especially at Dhaka city. The study is conducted on the basis of global PMI guidelines. For that I took help from PMBOK. The selections of the construction projects are mainly Public projects done by purposive sampling. The main concentration was paid to the identification of different types of risk and rating the various risks arises in a project and assessing major risk factors. Besides, this research developed a risk management framework for proper management of public construction projects and made some recommendation for the construction companies. For the purpose of this study, a questionnaire survey has been conducted and analyzed extensively. Finally study revealed that increase in material cost, increase of labor rate, loss due to corruption & bribery, loss due to political changes, project delay, and short time of tendering, lack of experience, loss due to fluctuation of construction materials, poor communication between stakeholders etc. as the top most risk factors. Mohammad Zabed Alam Mridha M. Procurement and Supply Management 2021-10-24T05:48:02Z 2021-10-24T05:48:02Z 2017 2017 Dissertation ID 16182007 http://hdl.handle.net/10361/15521 en Brac University dissertations are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 57 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
Risk assessment Public construction Public works Building materials industry |
spellingShingle |
Risk assessment Public construction Public works Building materials industry Mridha, Mohammad Zabed Alam Risk assessment at public sector construction projects in Bangladesh: a case study |
description |
This dissertation is submitted in partial fulfillment of the requirements for the degree of Masters in Procurement and Supply Management, 2017. |
author2 |
Hoque, Md. Mosta Gausul |
author_facet |
Hoque, Md. Mosta Gausul Mridha, Mohammad Zabed Alam |
format |
Dissertation |
author |
Mridha, Mohammad Zabed Alam |
author_sort |
Mridha, Mohammad Zabed Alam |
title |
Risk assessment at public sector construction projects in Bangladesh: a case study |
title_short |
Risk assessment at public sector construction projects in Bangladesh: a case study |
title_full |
Risk assessment at public sector construction projects in Bangladesh: a case study |
title_fullStr |
Risk assessment at public sector construction projects in Bangladesh: a case study |
title_full_unstemmed |
Risk assessment at public sector construction projects in Bangladesh: a case study |
title_sort |
risk assessment at public sector construction projects in bangladesh: a case study |
publisher |
Brac University |
publishDate |
2021 |
url |
http://hdl.handle.net/10361/15521 |
work_keys_str_mv |
AT mridhamohammadzabedalam riskassessmentatpublicsectorconstructionprojectsinbangladeshacasestudy |
_version_ |
1814309049951322112 |