Comparative load flow analysis of a 400/230 KV grid substation in Bangladesh
This thesis is submitted in partial fulfillment of the requirements for the degree of Bachelor of Science in Electrical and Electronic Engineering, 2020.
Главные авторы: | Khan, Rahat, Newaz, Abdullah Ibna, Haque, Mohd Fahim, Nafis, Nur Qutubul Alam |
---|---|
Другие авторы: | Huda, A. S. Nazmul |
Формат: | Диссертация |
Язык: | English |
Опубликовано: |
Brac University
2021
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/14893 |
Схожие документы
-
Regarding the 33/11KV substation (external substation) and temporary substation (internal substation)
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Scrutiny of electricity data for consumption and load forecasting
по: Islam, Samiul
Опубликовано: (2018) -
An autonomous industrial robot for loading and unloading goods
по: Kadir, Md. Abdul, и др.
Опубликовано: (2017) -
Reminder of high strain dynamic load test for piles of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Reminder of high strain dynamic load test for piles of BRAC University new campus project
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023)