Business model canvas of sewage treatment plant
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2020.
第一著者: | Alam, Walid |
---|---|
その他の著者: | Haq, Mahmudul |
フォーマット: | Internship report |
言語: | en_US |
出版事項: |
Brac University
2021
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/14351 |
類似資料
-
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
著者:: Aziz, Ahmed
出版事項: (2024) -
Industrial wastewater treatment in developing countries.
出版事項: (1985) -
Request to connect municipal sewage pipeline
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Connection with City Corporation sewage pipeline
著者:: Brac University
出版事項: (2023) -
Isolation of bacteriophage from sewage water samples specific for Vibriocholerae
著者:: Ebney, Nabil
出版事項: (2022)