Business model canvas of sewage treatment plant
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2020.
Príomhchruthaitheoir: | Alam, Walid |
---|---|
Rannpháirtithe: | Haq, Mahmudul |
Formáid: | Internship report |
Teanga: | en_US |
Foilsithe / Cruthaithe: |
Brac University
2021
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/14351 |
Míreanna comhchosúla
-
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
de réir: Aziz, Ahmed
Foilsithe / Cruthaithe: (2024) -
Industrial wastewater treatment in developing countries.
Foilsithe / Cruthaithe: (1985) -
Request to connect municipal sewage pipeline
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023) -
Connection with City Corporation sewage pipeline
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Isolation of bacteriophage from sewage water samples specific for Vibriocholerae
de réir: Ebney, Nabil
Foilsithe / Cruthaithe: (2022)