Business model canvas of sewage treatment plant
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2020.
Auteur principal: | Alam, Walid |
---|---|
Autres auteurs: | Haq, Mahmudul |
Format: | Internship report |
Langue: | en_US |
Publié: |
Brac University
2021
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/14351 |
Documents similaires
-
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
par: Aziz, Ahmed
Publié: (2024) -
Industrial wastewater treatment in developing countries.
Publié: (1985) -
Request to connect municipal sewage pipeline
par: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publié: (2023) -
Connection with City Corporation sewage pipeline
par: Brac University
Publié: (2023) -
Isolation of bacteriophage from sewage water samples specific for Vibriocholerae
par: Ebney, Nabil
Publié: (2022)