Business model canvas of sewage treatment plant
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2020.
Päätekijä: | Alam, Walid |
---|---|
Muut tekijät: | Haq, Mahmudul |
Aineistotyyppi: | Internship report |
Kieli: | en_US |
Julkaistu: |
Brac University
2021
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/14351 |
Samankaltaisia teoksia
-
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
Tekijä: Aziz, Ahmed
Julkaistu: (2024) -
Industrial wastewater treatment in developing countries.
Julkaistu: (1985) -
Request to connect municipal sewage pipeline
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Connection with City Corporation sewage pipeline
Tekijä: Brac University
Julkaistu: (2023) -
Isolation of bacteriophage from sewage water samples specific for Vibriocholerae
Tekijä: Ebney, Nabil
Julkaistu: (2022)