Business model canvas of sewage treatment plant
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2020.
Prif Awdur: | Alam, Walid |
---|---|
Awduron Eraill: | Haq, Mahmudul |
Fformat: | Internship report |
Iaith: | en_US |
Cyhoeddwyd: |
Brac University
2021
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/14351 |
Eitemau Tebyg
-
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
gan: Aziz, Ahmed
Cyhoeddwyd: (2024) -
Industrial wastewater treatment in developing countries.
Cyhoeddwyd: (1985) -
Request to connect municipal sewage pipeline
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023) -
Connection with City Corporation sewage pipeline
gan: Brac University
Cyhoeddwyd: (2023) -
Isolation of bacteriophage from sewage water samples specific for Vibriocholerae
gan: Ebney, Nabil
Cyhoeddwyd: (2022)