Business model canvas of sewage treatment plant
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2020.
Hlavní autor: | Alam, Walid |
---|---|
Další autoři: | Haq, Mahmudul |
Médium: | Internship report |
Jazyk: | en_US |
Vydáno: |
Brac University
2021
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/14351 |
Podobné jednotky
-
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
Autor: Aziz, Ahmed
Vydáno: (2024) -
Industrial wastewater treatment in developing countries.
Vydáno: (1985) -
Request to connect municipal sewage pipeline
Autor: BUCG-ABC Joint Venture (BUCG-ABC JV)
Vydáno: (2023) -
Connection with City Corporation sewage pipeline
Autor: Brac University
Vydáno: (2023) -
Isolation of bacteriophage from sewage water samples specific for Vibriocholerae
Autor: Ebney, Nabil
Vydáno: (2022)