Business model canvas of sewage treatment plant
This internship report is submitted in partial fulfillment of the requirements for the degree of Masters of Business Administration, 2020.
Autor principal: | Alam, Walid |
---|---|
Altres autors: | Haq, Mahmudul |
Format: | Internship report |
Idioma: | en_US |
Publicat: |
Brac University
2021
|
Matèries: | |
Accés en línia: | http://hdl.handle.net/10361/14351 |
Ítems similars
-
Challenges of building a waste water treatment plant under PPP model at Gazipur, Bangladesh
per: Aziz, Ahmed
Publicat: (2024) -
Industrial wastewater treatment in developing countries.
Publicat: (1985) -
Request to connect municipal sewage pipeline
per: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicat: (2023) -
Connection with City Corporation sewage pipeline
per: Brac University
Publicat: (2023) -
Isolation of bacteriophage from sewage water samples specific for Vibriocholerae
per: Ebney, Nabil
Publicat: (2022)