Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
Główni autorzy: | , |
---|---|
Format: | Research report |
Język: | English |
Wydane: |
BRAC Research and Evaluation Division (RED)
2019
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/13356 |