Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
Asıl Yazarlar: | Murtaza, Mohammad G., M. Ghulam Sattar |
---|---|
Materyal Türü: | Research report |
Dil: | English |
Baskı/Yayın Bilgisi: |
BRAC Research and Evaluation Division (RED)
2019
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/13356 |
Benzer Materyaller
-
Exploring Hazard Risks and People’s Adjustment: A Study in the Downstream of the Padma Multipurpose Bridge Project
Yazar:: Khan, Md Fahim Azraf
Baskı/Yayın Bilgisi: (2022) -
Report of the baseline survey of potential erosion and flood affected areas of Jamuna Multipurpose Bridge Project
Yazar:: Chowdhury, Pijush Kanti, ve diğerleri
Baskı/Yayın Bilgisi: (2019) -
নিজস্ব অর্থায়নে পদ্মা সেতু নির্মানের বাস্তবায়নযোগ্যতা নিয়ে সংশয়
Yazar:: দৈনিক প্রথম আলো
Baskı/Yayın Bilgisi: (2012) -
Revisiting Jamuna bridge resettlement areas: exploring livelihood status of the affected people
Yazar:: Ghosh, Shyamal C, ve diğerleri
Baskı/Yayın Bilgisi: (2019) -
Bridge and structure estimating /
Yazar:: Nardon, J. David
Baskı/Yayın Bilgisi: (1996)