Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
主要な著者: | Murtaza, Mohammad G., M. Ghulam Sattar |
---|---|
フォーマット: | Research report |
言語: | English |
出版事項: |
BRAC Research and Evaluation Division (RED)
2019
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/13356 |
類似資料
-
Exploring Hazard Risks and People’s Adjustment: A Study in the Downstream of the Padma Multipurpose Bridge Project
著者:: Khan, Md Fahim Azraf
出版事項: (2022) -
Report of the baseline survey of potential erosion and flood affected areas of Jamuna Multipurpose Bridge Project
著者:: Chowdhury, Pijush Kanti, 等
出版事項: (2019) -
নিজস্ব অর্থায়নে পদ্মা সেতু নির্মানের বাস্তবায়নযোগ্যতা নিয়ে সংশয়
著者:: দৈনিক প্রথম আলো
出版事項: (2012) -
Revisiting Jamuna bridge resettlement areas: exploring livelihood status of the affected people
著者:: Ghosh, Shyamal C, 等
出版事項: (2019) -
Bridge and structure estimating /
著者:: Nardon, J. David
出版事項: (1996)