Initial social impact of the Rupsha bridge project in Khulna
Fallowing a decision by the government to construct a bridge over the river Rupsha in Khulna, a number of preparatory studies were undertaken on different aspects of the bridge project. An initial social impact assessment was a part of these studies. Two alternative sites have been considered for...
Auteurs principaux: | Murtaza, Mohammad G., M. Ghulam Sattar |
---|---|
Format: | Research report |
Langue: | English |
Publié: |
BRAC Research and Evaluation Division (RED)
2019
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/13356 |
Documents similaires
-
Exploring Hazard Risks and People’s Adjustment: A Study in the Downstream of the Padma Multipurpose Bridge Project
par: Khan, Md Fahim Azraf
Publié: (2022) -
Report of the baseline survey of potential erosion and flood affected areas of Jamuna Multipurpose Bridge Project
par: Chowdhury, Pijush Kanti, et autres
Publié: (2019) -
নিজস্ব অর্থায়নে পদ্মা সেতু নির্মানের বাস্তবায়নযোগ্যতা নিয়ে সংশয়
par: দৈনিক প্রথম আলো
Publié: (2012) -
Revisiting Jamuna bridge resettlement areas: exploring livelihood status of the affected people
par: Ghosh, Shyamal C, et autres
Publié: (2019) -
Bridge and structure estimating /
par: Nardon, J. David
Publié: (1996)